Pledge Be there when the CPUC comes to North County.
Contact English Español
Save Pauma Valley Pledge to show up

SDG&E Golden Pacific Powerlink · South Mountain Alternative Say no to 500 kV powerlines through Pauma Valley.

SDG&E has proposed a 500 kV transmission line through our valley, and decisions are being made without our consent. We oppose it in every form. SDG&E has not filed with the CPUC yet. When it does, the CPUC will hold public hearings, and we need a full room. Pledge to show up, and become a member so your property counts in our CPUC protest.

Got a letter from SDG&E about surveying your land? Know your rights before you answer.
Pauma Valley seen from the hills: groves, homes and fields below the mountains Save Pauma Valley badge: Fight the Powerlink
Coalition news

Save Pauma Valley has joined We Save California

We have joined We Save California, a Southern California coalition of community groups and fire safe councils opposing SDG&E’s Golden Pacific Powerlink. One coalition, one voice to the CPUC.

Visit WeSaveCalifornia.org (opens in a new tab)
Watch and share

Under the Line

A short dramatization of what could happen if a fire starts under a 500 kV line in North County. Watch it, then send this page to two neighbors.

Video not playing? Watch on YouTube

Also watch our first video: Save Pauma Valley (1:26)

Step one · One minute

Be there when the CPUCcomes to North County

SDG&E has not filed with the CPUC yet. Once it does, the CPUC typically holds public hearings near the project, where anyone can speak. A full room, with cameras rolling, is the strongest message we can send. Pledge now and we will text and email you the date as soon as it is set.

We only use this to tell you about hearings and rallies on the Golden Pacific Powerlink.

Yellow Stop the Towers! bumper sticker with the Save Pauma Valley logo and SavePaumaValley.org

Free stickers and T-shirts

Yellow “Stop the Towers!” bumper stickers are free for everyone. T-shirts with the same yellow design are free for anyone who plans to join our next community action, whether that turns out to be a CPUC hearing or another event.

Pick up at the restaurant’s front desk at The Lazy H Ranch Resort in Pauma Valley during normal business hours. First come, first served.

At a CPUC public hearing

  • Anyone can speak for a few minutes.
  • What you say is transcribed into the public record.
  • The judge on the case presides, and commissioners sometimes attend.
  • Reporters and TV crews follow the crowd.
Step one · About three minutes

Join our CPUC protest.Your property counts.

Save Pauma Valley will file a formal protest with the CPUC. Every member who signs shows the CPUC how many neighbors, homes and parcels stand behind it. The more of us who join, the more weight our protest carries.

Save Pauma Valley is a group of Pauma Valley residents, now forming a 501(c)(3) nonprofit. Who we are

  • Your name is never filed publicly.
  • Owners, renters and growers can all sign.
  • You can still file your own protest.
  • Co-owners each sign their own form.
Where the decision stands · November 2026

SDG&E hasn’t filed yet

Nothing is approved. SDG&E has said it expects to file with the CPUC by the end of 2026. When it does, the formal case begins, protests are due about 30 days later, and the CPUC schedules public hearings. That is when we need you in the room.

  1. 2023The need is set. The state grid operator (CAISO) calls for a new 500 kV line in its 2022–2023 transmission plan.
  2. Summer 2026Routes go public. SDG&E holds open houses and shows its route options, including the South Mountain Alternative through Pauma Valley.
  3. NowPledge and join. Pledge to show up at the CPUC hearing, become a member, and bring in two neighbors.
  4. By the end of 2026SDG&E files with the CPUC. Its application starts the formal case and gets a case number.
  5. About 30 days after filingProtests are due. Save Pauma Valley files its protest on behalf of its members. Anyone can also post a public comment on the case.
  6. After filingPublic hearings. The CPUC typically holds public hearings near the project. This is when we show up, in numbers.
  7. 2027 onwardEnvironmental review and hearings. The CPUC studies the routes and alternatives, with public comment periods along the way, then decides.
  8. 2029 to 2032Construction and service, if approved. Construction could start in 2029, with the line in service in 2032.

Follow the case yourself: CPUC project page · SDG&E project site

It has been done before

The CPUC has said no to SDG&E before

In December 2002, the CPUC denied SDG&E’s Valley–Rainbow 500 kV line. It found the line was not needed for reliability and was not cost-effective for ratepayers.

A local group, Save Southwest Riverside County, took part in that case as a formal party. The CPUC later awarded it $629,119 to cover its costs. That is why we are filing a protest and filling the hearing room.

Source: CPUC decision D.03-10-056, summarizing D.02-12-066

Pledge to show up

Fire danger comes first

It has happened here.
Cal Fire found that SDG&E power lines started the 2007 Witch, Guejito and Rice fires in North County. Source In 2017 the CPUC refused to let SDG&E charge customers $379 million for those fires, and in 2019 the U.S. Supreme Court declined SDG&E’s appeal. Source Source
500,000 volts over dry brush.
Towers up to nearly 200 feet tall across our hills, in Santa Ana wind country.
Insurance is already leaving.
Many of us have lost coverage. This line adds risk we cannot afford.
How power lines start wildfires

When fire comes,the line gets in the way

Power lines don't just start fires. Once a fire is burning, a 500 kV line makes it harder and more dangerous to stop.

1,000 ft

Harder to fight

Fire guidance cited in the CPUC's review of SDG&E's Sunrise Powerlink says ground crews should not attack a fire within 500 feet of a power line. That leaves a strip about 1,000 feet wide along the whole line.

Air tankers and helicopters risk hitting towers and wires in the smoke. The review called it "especially hazardous" when lines run along ridge tops. Thick smoke can even carry electricity from the line to the ground and to the crews.

For Sunrise, the CPUC's review concluded the line "would reduce the effectiveness of firefighting," and found that impact significant and unmitigable in several areas, including Santa Ysabel, right next to us. Source

Millions

Hard to switch off

Big transmission lines are generally left out of the fire-weather power shutoffs we all know. In 2018 PG&E said its shutoff program did not cover lines of 115 kV and up: shutting them off needs the state grid operator, and could affect millions of customers.

Firefighters have to treat a line as live until the utility confirms it is off. Every minute they wait, the fire keeps moving.

This line would carry 500 kV, more than four times that voltage, bringing power into San Diego. Source

19 dead

Deadly even when idle

The January 2025 Eaton Fire killed 19 people and destroyed more than 9,400 homes and businesses. In August 2026, LA County fire investigators and Cal Fire concluded it was started by arcing on an out-of-service Southern California Edison transmission tower. Source

In 2018, a PG&E transmission line started the Camp Fire. PG&E pleaded guilty to 84 counts of involuntary manslaughter. Source

Bring this to the CPUC hearing. Ask how firefighters would attack a fire under this line, and how fast SDG&E could shut it off.

Pledge to show up

Fight the Powerlink: four things to do

Pledge to show up

When the CPUC holds its hearing near us, we need a full room. Pledge now and we will send you the date.

Make the pledge

Become a member

Sign once so your household and parcel count in our CPUC protest. About three minutes.

Sign the member form

Bring in two neighbors

Our goal is a member from every address on every road. Send this page to two people on yours.

Answer when we call

SDG&E has not filed with the CPUC yet. Once it does, a formal protest is due within 30 days, the CPUC schedules public hearings, and you will be able to post your own comment on the case online.

Members will get the link, the case number and the hearing date.

What's at stake

500 kV powerlines on towers up to nearly 200 feet tall would run directly through Pauma Valley. That creates extreme fire hazard for most of our properties and farms.

Many of us are already getting our insurance canceled, and we cannot afford further risk. Our homes, property values, rural community, and future are on the line.

Each tower would be about as tall as a 19-story building. And utility customers across most of California would help pay for the line through statewide transmission charges, not just North County.

Research on high-voltage lines finds that where they lower nearby sale prices, the effect is usually about 2% to 10%. Near one 500 kV line in rural Montana, home lots within 1,000 feet sold for an average of 15% less. Source

What is a 500 kV line? The plain facts
~200 FT proposed 500 kV tower Power pole about 40 ft 2-story house about 25 ft

The 2007 Witch Fire started about 56 feet from an arcing SDG&E line. It burned 197,990 acres.

Drawn to scale. Tower height as described for this project; the pole and the house are typical sizes. Fire elements are illustrative.

Is your property near the line?

We traced SDG&E's South Mountain route map onto real ground coordinates: 159 illustrative tower positions, about 1,600 feet apart, from west of I-15 near Fallbrook, through Pauma Valley and past Lake Henshaw, to San Felipe Road. Look up your parcel and note how close the line comes. Specific facts carry weight at the hearing and in public comments.

Parcel lines are exact. Tower positions are illustrative: SDG&E has not published an engineered alignment or tower sites.

Route map: the traced South Mountain line through Pauma Valley, with numbered illustrative tower positions

What living next to this line means

Fire danger

Power lines start wildfires, and a 500 kV line makes them harder to fight.

See the fire facts How power lines start wildfires

Cancer concern

The line would also put a constant magnetic field around nearby homes, which the World Health Organization's cancer agency lists as possibly causing cancer.

Studies found childhood leukemia about twice as common in homes with higher exposure. Scientists cannot rule it out.

See the field around your home

Protect your property now

Whatever the CPUC decides, a few steps today protect you later.

During construction

Months of heavy work, not just towers

SDG&E's Sunrise Powerlink, a 500 kV line finished in 2012, was built with:

  • Helicopters assembling towers and landing at pads near the work
  • Drilled concrete foundations at every tower site
  • New and regraded access roads up the hillsides
  • Staging yards for equipment and materials
  • Erosion and stormwater control on graded slopes

Expect similar work here: traffic control on our roads, and dust and noise over homes, groves and animals. Source

On a well?

Document your well

If construction ever affects your water, a record from before it starts is your proof.

  1. Have your water tested by a state-certified lab (California ELAP).
  2. After the well has rested for a few hours, measure the static water level: the distance from the ground down to the water.
  3. Write down the date, take photos, and keep the results somewhere safe.

Mention your well when you comment to the CPUC. Specific facts like this count.

Landowners

Know your rights

  • Got a survey letter? SDG&E is contacting landowners about sending biologists and archaeologists onto private property for field surveys related to the proposed Golden Pacific Powerlink. You can decline access. Keep a written copy of any response you send.
  • What the law says. Under California Code of Civil Procedure §§ 1245.010–1245.060, a utility authorized to use eminent domain may enter land for surveys and related studies. If the proposed entry and activities would cause actual damage or substantial interference with possession or use of the property, the utility must first obtain either your written consent or a superior court order (with a deposit set by the court for probable compensation). If you decline, SDG&E can petition the court for such an order. Non-invasive walking surveys and observations often do not meet the damage or substantial-interference threshold, but you still control access and can refuse. Source
  • Project approval and eminent domain come later. The Golden Pacific Powerlink has not been approved by the CPUC. Any later acquisition of easements through eminent domain would require CPUC approval of the project and route, plus additional steps, and SDG&E would have to pay fair market value. Survey access is a separate, earlier step. For now, you do not have to allow entry for these surveys.

General information, not legal advice. Individual circumstances (including any existing easements) can matter.

Herbicides

Ask what they will spray

SDG&E's weed control plan for the Sunrise Powerlink allowed glyphosate, triclopyr, 2,4-D, dicamba, imazapyr and other herbicides along the right-of-way, applied by licensed applicators with county approval. It set no buffer distances from water.

For a line over our groves, wells and creeks, ask the CPUC to require:

  • No spraying near wells, creeks or crops, including organic groves
  • Notice to landowners before any spraying
  • Mechanical clearing instead of herbicides wherever possible

Source

Get updates

News, deadlines and what to do next, by email or text.

We only use this for Golden Pacific Powerlink updates. Unsubscribe any time.

Our coalition

Save Pauma Valley is a member of the We Save California coalition, which opposes SDG&E's Golden Pacific Powerlink (sometimes called the Pacific Power Link) in all its forms, including the South Mountain Alternative.

WeSaveCalifornia.org (coalition) (opens in a new tab) SavePalomarMountain.org SaveTemecula.org SaveFallbrook.org SaveWarnerSprings.org SaveValleyCenter.org

If you can do more

Call SDG&E

Call 844-765-6388 and ask for an open house in Pauma Valley. None has been held here.

Put up a sign

Put a sign on your own property. Signs in the state right-of-way along Highway 76 get removed. Ask us for a sign.

Write your state legislators

Confirm who they are at findyourrep.legislature.ca.gov.

Volunteer

Spanish-speaking door-to-door, photos of your road, or watching the state case calendar. Join the task force. Or tell us on Facebook.

If we succeed

Pauma Valley stays our beautiful valley: our homes, our farms, and our rural community.

The decisions that shape it include our voice.

Sources and official links